WCCO EYE4 LOGO WCCO Radio wcco-eye-white01, ww color white

News

Fewer Lifts This Summer For Duluth Lift Bridge

View Comments
duluth

(credit: CBS)

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up

DULUTH, Minn. (AP) – Officials will try raising the Duluth Aerial Lift Bridge less frequently this summer in a bid to ease traffic congestion on the roads surrounding the bridge.

From May 27 through Labor Day, the bridge will lift every half-hour from 7 a.m. to 9 p.m. for recreational and small commercial boats. It’s a departure from in the past, when the bridge would lift any time for large freighters.

City officials say the reduced lifts, first tested in 2010, have reduced traffic congestion in Canal Park as well as wear and tear on the bridge. It also saves locals from having to wait for lifts.

The Duluth News Tribune reports in 2010, operators reported 1,045 fewer lifts than in 2009, a 23 percent reduction.

(© Copyright 2011 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View Comments
blog comments powered by Disqus
Follow

Get every new post delivered to your Inbox.

Join 1,813 other followers