Watch CBS News

Groundwork Begins On St. Croix Crossing Project

ST. PAUL, Minn. (AP) -- Crews are beginning groundwork on the St. Croix (kroy) Crossing project to connect Minnesota and Wisconsin.

The Minnesota Department of Transportation says crews this week will begin hauling materials adjacent to the Beach Road ramp off eastbound Highway 36 in Oak Park Heights.

Piles of dirt will be monitored during the winter to measure the weight-bearing ability of soils beneath the piles.

Crews also will build a parking lot this fall for use by the city of Oak Park Heights and a restaurant, to replace parking spaces lost to changes in the frontage road.

The St. Croix Crossing project will replace the 80-year-old Stillwater Lift Bridge with a four-lane bridge that will connect expressways on both sides of the St. Croix River.

(© Copyright 2012 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View CBS News In
CBS News App Open
Chrome Safari Continue
Be the first to know
Get browser notifications for breaking news, live events, and exclusive reporting.