Watch CBS News

Stillwater Lift Bridge Ends 2013 Schedule

STILLWATER, Minn. (AP) -- The Stillwater Lift Bridge has ended its summer lift schedule for the year.

That means boaters may encounter delays as they try to get under the bridge across the St. Croix River between Minnesota and Wisconsin.

The last day of the full lift schedule was Tuesday.

The bridge will remain in the down position until next spring. A 24-hour notice is needed to request the lift section be raised.

Boaters and other water traffic can request the lift be raised by calling Metro Dispatch at 651-234-7110.

(© Copyright 2013 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View CBS News In
CBS News App Open
Chrome Safari Continue
Be the first to know
Get browser notifications for breaking news, live events, and exclusive reporting.