WCCO EYE4 LOGO WCCO Radio wcco-eye-green01, ww color green

Local

Stillwater Lift Bridge Ends 2013 Schedule

View Comments
(credit: CBS)

(credit: CBS)

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up
Today's Most Popular Video
  1. 4 Things to Know For 7/21
  2. The Lowdown: Big Names Hit St. Paul For Starkey Gala
  3. Edward Hangs Out With River Rats Water Ski Team
  4. Tips For How To Beat The Heat
  5. Viral Vid Of The Day: Conan Signs Up For Tinder?

STILLWATER, Minn. (AP) — The Stillwater Lift Bridge has ended its summer lift schedule for the year.

That means boaters may encounter delays as they try to get under the bridge across the St. Croix River between Minnesota and Wisconsin.

The last day of the full lift schedule was Tuesday.

The bridge will remain in the down position until next spring. A 24-hour notice is needed to request the lift section be raised.

Boaters and other water traffic can request the lift be raised by calling Metro Dispatch at 651-234-7110.

(© Copyright 2013 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View Comments
blog comments powered by Disqus