WCCO EYE4 LOGO WCCO Radio wcco-eye-green01, ww color green

Latest News

New St. Croix Bridge Superstructure Work To Begin

View Comments

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up
Today's Most Popular Video
  1. 4 Things From 04/23
  2. Stillwater Man Helps Carry Fellow Boston Marathon Runner
  3. Disturbing Audio Played To Smith Jury
  4. Put Down The Phone, Parents; It Could Be Affecting Your Kids
  5. Locally-Owned Company Offers Green Suggestions For Your Home

STILLWATER, Minn. (AP) — Work begins soon on the superstructure of the new four-lane highway bridge over the St. Croix River connecting Minnesota and Wisconsin.

The Minnesota and Wisconsin departments of transportation this week approved a $332.5 million contract with the Lunda/Ames Joint Venture to build the St. Croix Crossing bridge superstructure.

Lunda/Ames plans to start pile-driving in mid-December at seven pier locations on the Minnesota side. The piers will support the Highway 36 approach bridge and ramp bridges that connect to the main river crossing.

Pile-driving at that location will continue through May 2014. Bridge construction will continue through 2016.

The $629 million span is scheduled to open in 2016, and will replace the old Stillwater Lift Bridge. The lift bridge will become part of a hiking and biking trail.

(© Copyright 2013 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View Comments
blog comments powered by Disqus