WCCO EYE4 LOGO WCCO Radio wcco-eye-white01, ww color white

Vikings

Big Crane To Help Build New Vikings Stadium

View Comments
Vikings Central
Shop for Vikings Gear
Buy Vikings Tickets

NFL Scoreboard
NFL Standings
Team STATS
Team Schedule
Team Roster
Team Injuries

Sports Fan Insider

Keep up with your favorite teams and athletes with daily updates.
Sign Up
Today's Most Popular Video
  1. Full Interview: Jesse Ventura Talks After Trial
  2. 4 Things To Know For 7/30
  3. Remarkable Softball Player Gets A Look At His Dream Job
  4. Lake Calhoun Hosting Paddle For Humanity
  5. The Lowdown: 'N Sync Album & 'Sharknado 2'

MINNEAPOLIS (AP) — A big crane is coming to help build the Minnesota Vikings new stadium.

The Minnesota Sports Facilities Authority and Mortenson Construction say one of the largest cranes in the world will be used to help build the $1 billion stadium.

The crane will start arriving at the construction site in downtown Minneapolis Monday morning. The crawler crane will arrive in 70 truckloads over 10 days. When assembled, the crane can lift up to 1,250 metric tons.

Assembling the crane’s sections will take about 11 days. Once erected, the crane will stand nearly 400 feet high. The crawler tracks are 8.5 feet high.

The crane will be on the site for about 15 months. The new stadium is due to open in 2016.

(© Copyright 2014 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View Comments
blog comments powered by Disqus