Lowry Tunnel Project, Lane Closures Begin

MINNEAPOLIS (WCCO) — If your commute takes you through downtown Minneapolis, prepare for some construction along the way.

The Lowry Hill Tunnel project started this weekend. It is now down to two lanes of traffic in both directions in just one tunnel.

Semi-trucks aren’t allowed to drive through the tunnel, and the speed limit is 40 miles per hour. The Lowry Hill project should wrap up by mid-September.

If you want to get a check of the roads, click here.

Comments

Leave a Reply

Please log in using one of these methods to post your comment:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From WCCO | CBS Minnesota

Good Question
Best Of Minnesota
Excellent Educator

Watch & Listen LIVE