WCCO EYE4 LOGO WCCO Radio wcco-eye-red01, ww color red

Martin Olav Sabo Pedestrian Bridge

Highway 55, Hiawatha, light rail

Firm Investigating Sabo Bridge Failure Releases Full Report

An engineering firm investigating what caused a structural failure to the pedestrian bridge over Hiawatha Avenue has released its full report of findings. The 140-page report goes over, in great detail, the findings of Wiss, Janney, Elstner Associates, Inc.

06/29/2012

Highway 55, Hiawatha, light rail

Early Report On Pedestrian Bridge Failure Released

The City of Minneapolis has released a report of preliminary findings in the structural failure of the pedestrian bridge over Hiawatha Avenue.

06/08/2012

(credit: CBS)

Hiawatha Ave. Closing Overnight This Week

The span of Hiawatha Avenue underneath the Martin Olav Sabo Pedestrian Bridge will be closing overnight this week.

05/29/2012

(credit: CBS)

Hiawatha Light Rail Resumes Service At All Stops

After a long and, for some, frustrating week of commuting in south Minneapolis, the Hiawatha Light Rail service once again resumed operations in all stations.

02/24/2012

Highway 55, Hiawatha, light rail

Last Inspection Of Pedestrian Bridge Found No Problems

Engineers found no sign of trouble during their last inspection of a pedestrian bridge in Minneapolis where a suspension cable broke loose Sunday night.

02/21/2012

(credit: CBS)

Hwy 55 Closed Tuesday AM Due To Bridge Cable Snap

Highway 55 will be closed to motorists between East 26th Street and Lake Street Tuesday morning while crews work to repair the pedestrian bridge above it that sustained a cable snap, the Department of Transportation said.

02/20/2012