Lift Bridge Construction Leads To No-Wake Zone On St. Croix

Boaters heading out onto the St. Croix River will have to abide by a new rule. Construction on the new crossing to replace the Stillwater Bridge near Oak Park Heights and St. Joseph, Wis. is underway. And that means a no-wake zone is in effect for nearly a mile along the river, reports Rachel Slavik (2:00).

WCCO 4 News At 6 – June 15, 2013