MnDOT spokesman Kent Barnard says the cable snapped at around 8 p.m. Now, the bridge is in down position and closed to traffic for boats 6-feet tall or higher.
Once a replacement cable arrives, it may take a week to install, weather permitting.
Click here for more information on the Stillwater Lift Bridge construction project.
You must log in to post a comment.