DULUTH, Minn. (AP) — Lake freighters are stacking up near the Twin Ports of Duluth and Superior, Wisconsin waiting for their turn to drop off shipments or take on loads before that the Soo Locks close in less than two weeks. The days of open water are numbered.

Nine lakers have turned the Duluth harbor into somewhat of a parking lot. Aerial Lift Bridge supervisor Dave Campbell says the holdup is the frigid temperatures. Campbell tells KBJR-TV it takes longer to load and the docks run into more problems when it’s so cold.

The freighter Thunder Bay dropped off a shipment of salt Tuesday as spectators watched before heading back out to pick up more cargo in Two Harbors.

Campell says the lakers will have to leave by the 13th or 14th because if they run into bad weather, they’ll be stuck.

(© Copyright 2017 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

Comments

Leave a Reply

Please log in using one of these methods to post your comment:

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.