WCCO EYE4 LOGO WCCO Radio wcco-eye-white01, ww color white

Local

Sabo Bridge Closed For Final Repairs

View Comments
(credit: Elkman/Wikipedia)

(credit: Elkman/Wikipedia)

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up
Today's Most Popular Video
  1. Why Is The Jury Taking So Long In Ventura Trial? Law Professor Weighs In
  2. Funeral Held For Gopher Legend McNamara
  3. QB Race On At Vikes' Training Camp
  4. WCCO Interview: Children's Defense Fund Study
  5. Human Cannonball Blows Minds At Canterbury

MINNEAPOLIS (WCCO) — Crews will begin making final repairs to the Sabo bike and pedestrian bridge in south Minneapolis on Monday.

The bridge will be closed to all bike and pedestrian traffic until the work is finished in December. Support cables on the bridge broke loose back in February.

After investigating, engineers ruled that wind caused the cables to vibrate, and eventually caused several plates on the bridge to crack.

View Comments
blog comments powered by Disqus