WCCO EYE4 LOGO WCCO Radio wcco-eye-green01, ww color green

Local

Groundwork Begins On St. Croix Crossing Project

View Comments
(credit: CBS)

(credit: CBS)

Get Breaking News First

Receive News, Politics, and Entertainment Headlines Each Morning.
Sign Up
Today's Most Popular Video
  1. Fleetwood Mac Returns To Minnesota
  2. 4 Things To Know For Oct. 1, 2014
  3. Queen Latifah Show Seeking Contestants At MOA
  4. Minneapolis, St. Paul Make The Top 10 For 'Coffee Snobs'
  5. WCCO Interview: Jude Miller Burke, Author Of 'Millionaire Mystique'

ST. PAUL, Minn. (AP) — Crews are beginning groundwork on the St. Croix Crossing project to connect Minnesota and Wisconsin.

The Minnesota Department of Transportation says crews this week will begin hauling materials adjacent to the Beach Road ramp off eastbound Highway 36 in Oak Park Heights.

Piles of dirt will be monitored during the winter to measure the weight-bearing ability of soils beneath the piles.

Crews also will build a parking lot this fall for use by the city of Oak Park Heights and a restaurant, to replace parking spaces lost to changes in the frontage road.

The St. Croix Crossing project will replace the 80-year-old Stillwater Lift Bridge with a four-lane bridge that will connect expressways on both sides of the St. Croix River.

(© Copyright 2012 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten or redistributed.)

View Comments
blog comments powered by Disqus
Follow

Get every new post delivered to your Inbox.

Join 1,875 other followers